Gold - Track Record

A few project profiles are provided:
(Click the headings for more information)

Acquisition of the Biox Group

Bateman Engineering has acquired the Biox technology business, the owner of the proprietary and patented technology known as the BIOX® process, from the Gold Fields Group.*

* The acquistion has conditions precedent that need to be fulfilled.

Centre of excellence provides internationally acclaimed leaching solutions

Bateman Engineering’s Centre of Excellence for Leaching provides the minerals resources industry with access to technology packages and historical proven designs for both primary and secondary copper leaching, complemented by leading expertise in the complete range of non-ferrous metal recovery processes.

Feasibility study completed for Doris North at Miramar's Hope Bay

BATEMAN has been contracted by Miramar Mining Corporation to investigate the potential to install an SAG (semi-autogenous grinding) mill to reduce capital and operating costs on the proposed initial development of the high-grade Doris North gold deposit at the Hope Bay project in Nunavut, Canada.

Gold-recovery complex for Uzbekistan

BATEMAN has been awarded a US$197,8M contract to revamp and modernise a gold-recovery complex for the Navoi Mining and Metallurgical Kombinat in the Republic of Uzbekistan. The complex will involve the No. 3 Hydrometallurgical plant, where a flotation process will be introduced, and the expansion of mining facilities at the Kokpatas and Daugystau gold deposits in the Kyzylkum desert. The proposed complex will process 5 Mt/yr of ore to produce 20 t/yr of gold.

The project will be funded by a structured finance package facilitated by BATEMAN.

CBS expands the Taror mill

Bateman Americas, Denver, is engaged in providing the on-site construction management services for the second phase of the expansion of the milling capacity at Taror mine, Tajikistan.

GOLD  Processing Plant