The Hartley Platinum Project
|
|

The cobalt solvent extraction circuit in the BMR.

Stainless steel and fibre glass vessels in the base metal refinery
(BMR).
|
The project involved the provision of facilities to process 2,1M t/yr
of ore from the Hartley Platinum Mine and included conveyors from the
mine to the plant, the milling and fotation circuits, the smelter, the
base metals refinery and the necessary infrastructure. BATEMANs
involvement in the project was ongoing, starting in 1990 with the preliminary
feasibility study and culminating in the execution of the project.
High environmental standards for the plant had to be observed. This
is a non-toxic discharge plant with respect to sewage, reticulation
and storm-water systems. Dust and gas emissions are strictly controlled
with sulphur dioxide monitoring stations in the surrounding areas. Boreholes
at the tailings dam have the latest monitoring and testing equipment.

The Hartley Platinum processing plant.

The milling circuit with ball and SAG mill and ROM silo on the right.

The furnace building with electrostatic precipitator and exhaust
stack.