The Hartley Platinum Project



The cobalt solvent extraction circuit in the BMR.
 



Stainless steel and fibre glass vessels in the base metal refinery (BMR).

 
The project involved the provision of facilities to process 2,1M t/yr of ore from the Hartley Platinum Mine and included conveyors from the mine to the plant, the milling and fotation circuits, the smelter, the base metals refinery and the necessary infrastructure. BATEMAN’s involvement in the project was ongoing, starting in 1990 with the preliminary feasibility study and culminating in the execution of the project.

High environmental standards for the plant had to be observed. This is a non-toxic discharge plant with respect to sewage, reticulation and storm-water systems. Dust and gas emissions are strictly controlled with sulphur dioxide monitoring stations in the surrounding areas. Boreholes at the tailings dam have the latest monitoring and testing equipment.



The Hartley Platinum processing plant.
 


The milling circuit with ball and SAG mill and ROM silo on the right.
 


The furnace building with electrostatic precipitator and exhaust stack.